摘要 |
The cross-piece has a length corresponding to the interval between the facade and front uprights, which determine the depth of facade scaffolding, and the cross-piece comprising, at the ends, means for guidance on the scaffolding uprights and for support on the connecting pins of the railing elements and allowing the positioning of new walkway platform elements which mate with the connecting points of the railings in the scaffolding.
|