发明名称 PILE DRIVING WORK METHOD
摘要 PROBLEM TO BE SOLVED: To meet the needs not to use bentonite and to reduce waste excavation soil volume in the pile driving work without vibrations and noises. SOLUTION: A small-diameter pile can be made to be comparable in support power to a large-diameter pile by the method which combines the primary excavation process to bore earth applying pressure to the bore hole wall with an oval screw in a sectional shape and a short head attached to its leading end, with the secondary excavation process to insert a prefabricated pile with a bottom expanding plate while revolving them and injecting cement milk. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006200339(A) 申请公布日期 2006.08.03
申请号 JP20050041266 申请日期 2005.01.19
申请人 TSUJI SEIJI 发明人 TSUJI SEIJI
分类号 E02D7/00;E02D5/56 主分类号 E02D7/00
代理机构 代理人
主权项
地址