发明名称 |
CONSTRUCTION MATERIAL, METHOD OF MANUFACTURING CONSTRUCTION MATERIAL, CONSTRUCTION METHOD, RAILROAD BALLAST, CONSTRUCTION METHOD OF RAILROAD BALLAST, SOIL BASE COURSE FOR LABOR-SAVING TRACK, CONSTRUCTION METHOD OF SOIL BASE COURSE FOR LABOR-SAVING TRACK, GROUND OF STRUCTURE, AND CONSTRUCTION METHOD OF GROUND OF STRUCTURE |
摘要 |
PROBLEM TO BE SOLVED: To provide railroad ballast, the ground of a structure, and construction methods thereof for effectively preventing the occurrence of frost heave on the railroad ballast and the grounds of various structures, effectively utilizing industrial waste and low in construction cost. SOLUTION: In this construction method, a construction material obtained by mixing clinker ash and a frost heaving material so that the weight ratio of the clinker ash to the total weight of the clinker ash and frost heaving material is≥50% and <100%, is used for the railroad ballast 2 and the grounds of various structures to carry out construction. It is preferable to mix the clinker ash to have the ratio of≥70% and <95%. The frost heaving material is gravel including fine grain portions, sand, crushed stones adjusted in grain size, or the like. COPYRIGHT: (C)2006,JPO&NCIPI
|
申请公布号 |
JP2006188905(A) |
申请公布日期 |
2006.07.20 |
申请号 |
JP20050002327 |
申请日期 |
2005.01.07 |
申请人 |
HOKKAIDO UNIV;EAST JAPAN RAILWAY CO;HOKKAIDO RAILWAY CO |
发明人 |
AKAGAWA SATOSHI;MORI JUNKO;AIHARA HIROTAKA;NAKAMURA DAISUKE;IKEZU DAISUKE;TAKIGUCHI KOJI;TSUNASHIMA KAZUHIKO;KAWASHIMA YASUTAKA;HORI MICHIAKI |
分类号 |
E01B1/00;E01B19/00;E02D31/14 |
主分类号 |
E01B1/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|