摘要 |
<p>The method involves generating possible alternate routes based on the status of lift and existing calls. A cost function is defined based on service time for alternate route and energy consumption. A set of solutions for alternate route at low energy consumption is defined. The solution satisfying desired service time is selected based on which the calls are allocated to the lifts. An Independent claim is also included for lift control system.</p> |