摘要 |
PROBLEM TO BE SOLVED: To provide technique for managing the schedule/result of a job by which a security such as detecting not only validity in a performed work but unnecessary job execution, etc., is reinforced and the health and safety of a system is secured. SOLUTION: In collation between a current day execution schedule information file 103 and a current day executed job history information file 104, the execution/nonexecution of an actual result relative to a schedule is checked. In addition to it, classification is conducted, i.e., a job which exists in a schedule file but does not exist in a history file is classified to an unexecution file 105, a job which exists in an actual result file as an error is to an error file 106, a job which exists in the history file by the more frequently than the in the schedule file is to a re-execution file 107, a job which does not exists in the schedule file but exists in the history file is to a temporary file 108, a job where a skipping is performed is to a skip file 110, a job which is kept as the error and is not processed is to an unprocessed list 116, respectively in response to a check result and an actual result content. Then the jobs are outputted. COPYRIGHT: (C)2006,JPO&NCIPI
|