摘要 |
PROBLEM TO BE SOLVED: To solve a problem in conventional technology wherein since devices and operations for assembling a large-scale scaffold are rquired, much time is required for the construction work and, once the scaffold is completed, its change and modification are difficult. SOLUTION: This constructing and curing tent comprises a pair of wire support parts 1 and 1, a main wire 3 fixed at one end and having a wire take-up device 2 at the other end and movably installed across the pair of wire support parts 1 and 1, and a sheet 4 put on the main wire 3 and covering the lower surface of the main wire. The wire take-up device 2 takes up the main wire 3 loosened between the pair of wire support parts 1 and 1, and stretches the main wire 3 between the wire support parts 1 and 1. The sheet 4 is put on the loosened main wire 3, and deployed by stretching the main wire 3. COPYRIGHT: (C)2006,JPO&NCIPI
|