发明名称 STRUCTURE AND METHOD FOR PREVENTING SCATTERING OF CRUSHED STONE
摘要 PROBLEM TO BE SOLVED: To prevent the scattering of crushed stones by performing simple construction work and preventing a burden from being imposed on the environment, in a track bed of a railroad or a graveled road, where the crushed stones are used. SOLUTION: The track bed of the railroad or the graveled road, where the crushed stones are used, is covered with a biodegradable resin. The chip-like or fibrous biodegradable resin is sprayed on the track bed of the railroad or the graveled road, where the crushed stones are used, and melted to cover the track bed of the railroad or the graveled road. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006124912(A) 申请公布日期 2006.05.18
申请号 JP20040310259 申请日期 2004.10.26
申请人 UNITICA FIBERS LTD 发明人 SAKOBE TADAYUKI;YAMAGUCHI SO;HAZAMA REIICHI;UENOYAMA TAKUYA
分类号 E01B19/00 主分类号 E01B19/00
代理机构 代理人
主权项
地址