摘要 |
PROBLEM TO BE SOLVED: To provide a full-year cooling and heating installation using a heating device using a boiler unit for cooling operation without double equipment investment such that a new cooling device is installed separately from the heating device using the boiler unit. SOLUTION: In a heat medium circuit C of the heating device B through which heat medium heated by the boiler unit 10 is circulated into heat radiating equipments 21, 22, three-way valves 31, 32 are provided for circulating either the heat medium heated by the boiler unit 10 or heat medium cooled with heat exchange in a ground. A ground heat exchange unit 40 for cooling the heat medium with heat exchange in the ground is connected to the three-way valves 31, 32. During cooling operation, the heat medium cooled with the heat exchange in the ground is circulated through the three-way valves 31, 32 into the heat radiating equipments 21, 22. COPYRIGHT: (C)2006,JPO&NCIPI
|