摘要 |
PROBLEM TO BE SOLVED: To provide a repairing method of a concrete tank. SOLUTION: A balloon body 15 is arranged between a liquid level of tap water 2 in the tank and the ceiling 1c. The tank is repaired in a close contact state to a side plate by inflating this balloon body 15. COPYRIGHT: (C)2006,JPO&NCIPI
|