发明名称 WELL CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To dispense with an excessive suspending/press-fitting device while eliminating uneconomical property of an auxiliary construction method (a substitution method) in a well construction method for constructing a cylindrical structure underground. SOLUTION: The cylindrical structure 2 is suspended and supported in a shaft 16 by air bags 17 as a measure to prevent settlement caused by the self-weight of the cylindrical structure 2 in excavating the whole or a part of the ground inside and at a lower region of the cylindrical structure 2 while constructing the cylindrical structure 2 with a plurality of cylindrical bodies 1, and repeating settlement by the self-weight of the cylindrical structure 2 or press-fitting by a machine to construct the predetermined cylindrical structure 2 underground. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006070469(A) 申请公布日期 2006.03.16
申请号 JP20040251968 申请日期 2004.08.31
申请人 KATO CONSTRUCTION CO LTD 发明人 MAKINO MASAKI;OZOE KENICHI;HAMADA YOSHIYUKI
分类号 E02D23/08;E02D29/045;E21D13/00 主分类号 E02D23/08
代理机构 代理人
主权项
地址