发明名称 METHOD OF PREVENTING FROST HEAVE STRESS CONCENTRATIONS IN CHILLED BURIED PIPELINES
摘要 A method for maintaining a stable soil by surrounding a chilled gas pipe wit h a material that has an antifreeze component that prevents the soil from freezing. By keeping the soil from freezing, it remains stable at all times. The method calls for excavating a trench, lining it with a geotextile membrane that keeps water from infiltrating into the trench, and then surrounding it with a bed of limeston e (calcium carbonate) that is mixed with calcium magnesium acetate (CMA), which acts as an anti-freeze agent. The limestone-CMA mixture surrounds the pipe. The trench is covered by another geotextile membrane to completely seal it. In this way, the pipeline is surrounded by a material that is not subject to freezing. As such, it provid es a stable bed for the pipeline to prevent frost heaving.
申请公布号 CA2502173(A1) 申请公布日期 2006.03.14
申请号 CA20052502173 申请日期 2005.03.24
申请人 METZ, PAUL A.;DONNELLAN, BARRY 发明人 METZ, PAUL A.;DONNELLAN, BARRY
分类号 F16L1/026;E02D19/14;E02D31/14;F16L1/00;F16L1/06;F16L59/00;F16L59/02;F16L59/04 主分类号 F16L1/026
代理机构 代理人
主权项
地址