摘要 |
PROBLEM TO BE SOLVED: To provide an air conditioner monitoring system capable of realizing cooperative control of a plurality of air conditioners. SOLUTION: When the plurality of air conditioners 11-11n and information processing devices 2-2n are installed in a certain zone (air-conditioned computer room), they are communicated and connected with a monitoring/controlling device 100 by network wiring 1 to perform integrated monitoring by SNMP, and to perform cooperative control of the air conditioners 11-11n. For example, when a part of the air conditioners is stopped (stopped by failure or manual operation), or when the cooling capacity is insufficient in a part of the air conditioners, the other conditioners are controlled to increase their cooling capacity to complement the insufficiency. COPYRIGHT: (C)2006,JPO&NCIPI |