摘要 |
PROBLEM TO BE SOLVED: To provide a shearing force reinforcing method, a shearing force reinforcing structure, and a shear reinforcing member for an existing RC (reinforced concrete) structure for easily and positively ensuring predetermined pull-out rigidity. SOLUTION: The shearing force reinforcing method of an intermediate wall W of the existing RC structure to which shearing force is applied, includes (1) a process for boring a reinforcing member insertion hole 10 for installing the shear reinforcing member 20 passing through the intermediate wall W of the existing RC structure, (2) a process for filling a filler 30 in the reinforcing member insertion hole 10, and (3) a process for inserting a shear reinforcing bar 21 and a base end plate head 23 provided at the base end, into the reinforcing member insertion hole 10, and fixing a tip plate head 22 to the tip part of the shear reinforcing bar 21 to dispose the shear reinforcing member 20 within the intermediate wall W. COPYRIGHT: (C)2006,JPO&NCIPI
|