发明名称 STRUCTURE AND JOINTING METHOD OF SHIELD TUNNEL JOINT PART
摘要 PROBLEM TO BE SOLVED: To simplify the contents of works, to shorten the work time, to reduce the amount, weight and size of equipment and materials, and to facilitate acquisition of technique. SOLUTION: In a joint part between the existing tunnel 1 and a newly constructed tunnel 2, a visible light curable resin holding sheet 6 is stuck to the concrete inner surface of the existing tunnel, and after the resin is cured by light irradiation, the newly constructed tunnel 2 is joined to the existing tunnel 1. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006037665(A) 申请公布日期 2006.02.09
申请号 JP20040222979 申请日期 2004.07.30
申请人 SHIMIZU CORP;SHOWA HIGHPOLYMER CO LTD 发明人 ISHII KIYOSHI;SAKAI SHUNICHI;SEKI SHINJI;OTANI KAZUO
分类号 E21D11/04;E21D9/06 主分类号 E21D11/04
代理机构 代理人
主权项
地址