摘要 |
PROBLEM TO BE SOLVED: To provide a construction method for easily constructing artificial land for constructing a structure on the weak ground. SOLUTION: Construction cost can be extremely reduced, by shortening a laying cost work period, by arranging dirt floor reinforced concrete 3 placed on the weak ground, a concrete retaining wall 1 arranged on the outer periphery of the dirt floor reinforced concrete 3, a plastic box 5 fixed on the dirt floor reinforced concrete 3, and a concrete floor 9 on an upper surface of the plastic box 5. COPYRIGHT: (C)2006,JPO&NCIPI
|