摘要 |
PROBLEM TO BE SOLVED: To provide a bridge structure and its construction method securing a head clearance of a bridge, shortening workhours for new construction work and improvement work of the bridge, coping with a narrow working space, reducing a construction cost, having high durability and minimizing the suspension of traffic of a road or the like under the bridge. SOLUTION: In this bridge structure, the bridge is composed of an upper structure and a lower structure, and steel fitting joints of approximately C-shaped cross section are continuously provided at the lower end of the upper structure and the upper end of the lower structure. The steel fitting joints of the upper structure and lower structure are slid and fitted to integrate the upper structure and the lower structure. COPYRIGHT: (C)2006,JPO&NCIPI
|