摘要 |
<p>A method for operating an automation system (1), which has at least one bus system (2) with bus substations (21-29) and a central control unit (3), involves parametrizing and/or programming at least one bus substation (24,27) by the control device (3), An interruption of the connection link to the control device (3) is detected by at least one bus substation, whose output is controlled : An independent claim is included for an automation system.</p> |