摘要 |
<P>PROBLEM TO BE SOLVED: To realize a storage water heater free from air-lock phenomenon and capable of simplifying the work for filling the heat storage fluid by filling the heat storage fluid from a primary-side circulation flow channel successively to a heating heat exchanger and a hot water storage tank. <P>SOLUTION: The primary-side circulation flow channels 11, 11a are constituted to supply the heat storage fluid to an upstream part of a hot water supply heat exchanger 30 and a reheating heat exchanger 60, then pressure-feed the same to the hot water supply heat exchanger 30 and the reheating heat exchanger 60 side to be filled in a hot water storage tank 10 side, when the heat storage fluid is filled in the hot water storage tank 10. Thus the air lock phenomenon can be prevented and the filling work can be easily performed. <P>COPYRIGHT: (C)2006,JPO&NCIPI |