摘要 |
PROBLEM TO BE SOLVED: To shorten the execution time for the wiring work at site for installing a conveyor. SOLUTION: In a rail supporting structure 1 in which a pair of right and left guide rails 3, 3 of substantially U-shaped section in front view with openings thereof facing each other with a space B in the right-to-left direction to guide a moving body 21 moving on a predetermined path with a work loaded thereon are supported on inner face sides in the right-to-left direction of upper parts of a plurality of yokes 2, etc. of substantially U-shaped section in front view having an opening S on the upper side arranged in the moving direction of the moving body 21, a cable to connect equipment arranged around the guide rails 3, 3 is supported by a cable supporting member 8 stretched between a lower part of the opening S of one yoke 2 and a lower part of the opening S of the other yoke 2 in the yokes 2, 2 adjacent to each other in the moving direction of the moving body 21. The cable is passed through the space B in the right-to-left direction of the guide rails 3, 3 and easily wired. COPYRIGHT: (C)2006,JPO&NCIPI
|