发明名称 METHOD FOR PREPARING IN-GROUND TUNNEL STRUCTURES
摘要 The present invention provides an improved method for repairing in-ground tunnel structures (6). The method involves applying a first curable resin over a cementitious liner (18) which lines the interior wall surfaces (14) of the tunnel (6), drilling drainage holes (30) in the cementitious liner (18), and filling the drainage holes (30) with a second curable resin. The resins are allowed to cure and harden. The cured resins seal the wall surfaces (20) and drainage holes (30) to provide a composite tunnel structure (6) having high mechanical strength and resistance to fluid leaks.
申请公布号 WO2005045195(A3) 申请公布日期 2005.12.29
申请号 WO2004US35670 申请日期 2004.10.27
申请人 WARREN, DANIEL 发明人 WARREN, DANIEL
分类号 E02D37/00;E21D11/38 主分类号 E02D37/00
代理机构 代理人
主权项
地址