摘要 |
PROBLEM TO BE SOLVED: To provide a finishing structure for a projected corner of a building, which drastically improves the workability of a corner portion of the building at the time of spray coating, and contributes to cost reduction by employing an auxiliary finish member in a tabular form, and to provide a finishing method for the projected corner. SOLUTION: The finishing structure for the projected corner A of the building is formed by abutting a side surface of a first wall panel 1 and an end face of a second wall panel 2 on each other. According to the finishing structure, finishing plates 3 are attached to surfaces of the first and second wall panels 1, 2 so as to cover the entire surfaces, and the auxiliary finish member 4 is arranged on an end face of the first wall panel 1 so as to cover the same. COPYRIGHT: (C)2006,JPO&NCIPI
|