发明名称 WASTE MATERIAL COMBUSTION INSTALLATION
摘要 PROBLEM TO BE SOLVED: To provide a waste material combustion installation for actualizing combustion control while properly determining the combustion condition of refuse charged into a furnace. SOLUTION: The waste material combustion installation comprises an image processing part 35 for applying image processing to the picked-up images of the inside of a fluidized bed combustion furnace 1 for refuse combustion to extract the contour figures of a combustion region, a fractal dimension computing part 36 for finding the fractal dimensions of the contour figures obtained by the image processing part, and a parameter determining part 37 for determining control parameters to control the supply amount of secondary air and the supply amount of refuse in accordance with the fractal dimensions found by the fractal dimension computing part. When the fractal dimension is smaller than a smaller threshold value out of two greater and smaller threshold values showing the range of a normal combustion condition, the supply amount of the refuse and the supply amount of the secondary air are less than those in the normal combustion condition. When the fractal dimension is greater than the greater threshold value, the supply amount of the refuse and the supply amount of the secondary air are controlled to be less and more, respectively, than those in the normal combustion condition. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2005337556(A) 申请公布日期 2005.12.08
申请号 JP20040155384 申请日期 2004.05.26
申请人 HITACHI ZOSEN CORP 发明人 FUJIYOSHI MAKOTO;FUKUSHIMA RYUTARO;NAKAYAMA KOICHIRO;HAYASHI KAZUHISA
分类号 F23G5/50;(IPC1-7):F23G5/50 主分类号 F23G5/50
代理机构 代理人
主权项
地址