发明名称 BRIDGE PAINTING WORK TRUCK AND BRIDGE PAINTING WORK METHOD
摘要 PROBLEM TO BE SOLVED: To propose a bridge painting work method for efficiently carrying out painting work of a beam disposed at the upper end part of a bridge. SOLUTION: This bridge painting work truck 1 composed of a lateral pair of trucks 2, 3 connected to each other is assembled on right and left working rails 111, 112 corresponding to the painting work start position of a truss beam 105 of the bridge 100, and workers get on a lower stage floor panel 13, an upper stage floor panel 17, or the like of the assembled bridge painting work truck 1 to carry out painting work of the truss beam 105. A rotary steering wheel 23 is turned to move the bridge painting work truck 1 along the working rails 111, 112 into the following painting work position. Painting and movement are repeated, and after painting work is completed, the bridge painting work truck 1 is moved into a predetermined position and dismantled. Compared with the case of building up a scaffolding along the truss beam 105 to carry out painting, work efficiency is high, and cost can be considerably reduced. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2005330744(A) 申请公布日期 2005.12.02
申请号 JP20040151390 申请日期 2004.05.21
申请人 HONSHI TOSO KOGYO KK;KENSETSU TOSO KOGYO KK;CHUBU ENGINEERING:KK 发明人 OTANI TAKEO;NISHIDA HIROSHI;NISHIZAWA EIJI
分类号 E01D22/00;E01D2/00;E01D19/10;(IPC1-7):E01D22/00 主分类号 E01D22/00
代理机构 代理人
主权项
地址