发明名称 Scheduling non-integral simulation time for mixed-signal simulation
摘要 In the simulation of an analog and mixed-signal analog-digital physical circuit, events are assigned scheduled times. The events are stored in buckets in a hash table, with the scheduled times of the events in each bucket associated with the bucket. The scheduled times are organized into a heap, with the earliest scheduled time at the root of the heap. The earliest scheduled time is removed from the heap, and the events in the associated bucket are performed. Performing the scheduled events can cause new events to be scheduled, and existing events to be de-scheduled. When all the events in the bucket associated with the earliest scheduled time are simulated, the remaining scheduled times are re-organized into a new heap, and the steps of removing the earliest scheduled time, performing the scheduled events, and re-organizing the remaining scheduled times are repeated.
申请公布号 US6961689(B1) 申请公布日期 2005.11.01
申请号 US20000531350 申请日期 2000.03.21
申请人 SYNOPSYS, INC. 发明人 GREENBERG STEVEN S.
分类号 G06F7/62;G06F17/50;(IPC1-7):G06F7/62 主分类号 G06F7/62
代理机构 代理人
主权项
地址