发明名称 An erection unit for a building floor slab and theerection method thereof.
摘要 The fast mounting mechanism for building floor board includes one installing rider and one pull rod, and the pull rod has one suspensino end and one planting end into concrete and with one expanded bolt head. The fast floor board mounting process includes fixing floor board formwork, installing steel bar in proper position of floor board formwork, depositing concrete while planting the planting end of pull rods into concrete and fixing the suspension end to the installing rider fixed in bearing structure, disassembling the floor board formwork for the installation of the next layer of floor board after the floor board is partially solidified, and taking out the pull rods from the concrete after the floor board solidifies to support its weight. The present invention results in high floor board installing efficiency.
申请公布号 ZA200406087(B) 申请公布日期 2005.10.25
申请号 ZA20040006087 申请日期 2004.07.29
申请人 LI YUANHE 发明人 YUANHE LI
分类号 E04B;E04B5/00;E04G;E04G17/16 主分类号 E04B
代理机构 代理人
主权项
地址