发明名称 Choosing whether to use a delayed index maintenance depending on the portion of the materialized view (MV) changed
摘要 In an embodiment, estimated costs are used to pick the best refresh technique (e.g., method) for a given MV. In another embodiment, estimated costs are used to schedule the refresh of a set MVs in an order such that overall time to refresh is reduced, or in an order that uses the smallest overall time, for refreshing when compared to other alternative refresh schedules. In another embodiment, the estimated cost of refreshing each of a set of MVs is used to select the set of CPU resources to allocate to refreshing each MV. Based on the estimated costs, the allocation of CPU resources is chosen to be more optimal (e.g., use less CPU time) than other available sets of CPU resources. In an embodiment, when refreshing an MV, delayed index maintenance is chosen if a significant portion of the base table and/or the partitions of the table has changed.
申请公布号 US2005235003(A1) 申请公布日期 2005.10.20
申请号 US20050083804 申请日期 2005.03.18
申请人 FOLKERT NATHANIEL K;GUPTA ABHINAV;WITKOWSKI ANDREW 发明人 FOLKERT NATHANIEL K.;GUPTA ABHINAV;WITKOWSKI ANDREW
分类号 G06F17/30;(IPC1-7):G06F17/30 主分类号 G06F17/30
代理机构 代理人
主权项
地址