摘要 |
The method involves moving a monolith block (10) by a conveyor (15) with respect to a position of circular saw blades (16). The blades are mounted on a driving shaft (17) with an equal intermediate distance or a distance equal to dimension of a construction block (11) to be fabricated. The monolith block is cut by the blades along longitudinal direction and transversal direction. |