发明名称 WELL BOTTOM ZONE TREATMENT METHOD
摘要 FIELD: oil industry, particularly for stimulating production. ^ SUBSTANCE: method for treating bottom zone of well provided with tubing string involves performing lowering of flexible extremeline elongated pipes of coiled tubing plant; injecting light-gravity oil in well and to bottom zone; moving flexible extremeline elongated pipes of coiled tubing plant to well bottom; continuing oil injection up to full well-killing fluid substitution for oil; lifting lower ends of flexible extremeline elongated pipes up to reaching production bed roof; sealing well; injecting 0.5-1.5 m3 of hydrochloric acid solution into bottom zone through flexible extremeline elongated pipes of coiled tubing plant; lowering ends of flexible extremeline elongated pipes of coiled tubing plant for 0.8-1.2 m and injecting 0.5-1.5 m3 of hydrochloric acid solution; continuing lowering and injection operations up to reaching production bed bottom; lifting lower ends of flexible extremeline elongated pipes of coiled tubing plant for height equal to half of well height and leaving the extremeline elongated pipes as they are for 2-3 hours; gradually lowering flexible extremeline elongated pipes of coiled tubing plant up to reaching well bottom and injecting oil simultaneously with well fluid extraction through hole annuity; flushing well with oil; removing flexible extremeline elongated pipes of coiled tubing plant from the well and closing hole annuity; performing setup operations and bringing well into operation. ^ EFFECT: increased well debit. ^ 1 ex
申请公布号 RU2261991(C1) 申请公布日期 2005.10.10
申请号 RU20040130008 申请日期 2004.10.12
申请人 发明人 IBRAGIMOV N.G.;KORMISHIN E.G.;ISAKOV V.S.;SHARIKOV G.N.;CHUPIKOVA I.Z.;TORIKOVA L.I.
分类号 E21B43/27;E21B33/13 主分类号 E21B43/27
代理机构 代理人
主权项
地址