发明名称 TREATMENT METHOD FOR TAR SLUDGE AND COAL LOADING VEHICLE
摘要 PROBLEM TO BE SOLVED: To provide a tar sludge treatment method and a coal loading vehicle that retain high productivity of coke furnace operation, high yield rate of coke production and enables effective recycling of tar sludge. SOLUTION: Coking coal 100 is charged in a carbonization chamber 12, then the coking coal 100 is leveled with a leveler 17 on the surface and tar sludge 200 is introduced into the carbonizing chamber 12. Thereby coking coal layers and tar sludge layers are clearly separated in the carbonization chamber. In this case, the charge of the tar sludge 200 into the carbonizing chamber is preferably carried out immediately after dry distillation. When the tar sludge 200 is charged into the carbonization chamber, the tar sludge stored in a tar sludge tank 2 that is arranged in the coal loading vehicle 11 is charged via distributing headers 4. Thus, the charge of the tar sludge 200 into individual carbonization chambers 12 can efficiently be carried out. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2005272715(A) 申请公布日期 2005.10.06
申请号 JP20040089897 申请日期 2004.03.25
申请人 JFE STEEL KK 发明人 TAKIGAWA MANABU
分类号 C10B31/12;C10B37/02;C10B57/04;C10C1/00;(IPC1-7):C10C1/00 主分类号 C10B31/12
代理机构 代理人
主权项
地址