发明名称 |
SCHALTUNGSANORDNUNG ZUR UBERPRÜFUNG DER VERSORGUNG EINER ELEKTRISCHEN LAST UND VERFAHREN HIERFÜR |
摘要 |
The circuit arrangement (SC) has an input (P) for connection to an electrical energy supply (PS) and potential divider with a measurement output (S) for controlling voltage monitoring. The circuit arrangement has a current sensor (CS) for determining a load current (I). The potential divider contains a switchable element (X) coupled to the current sensor so that a changeover of the element takes place at a defined load current level so that a voltage changes occurs at the measurement output. - Independent claims are also included for the following: - (a) a monitoring device with an inventive circuit arrangement - (b) an electrical power supply with an integrated circuit arrangement - (c) and a method of checking the supply of an electric load |
申请公布号 |
AT304744(T) |
申请公布日期 |
2005.09.15 |
申请号 |
AT20030291825T |
申请日期 |
2003.07.24 |
申请人 |
ALCATEL |
发明人 |
GEBERT, THOMAS;LAUTERBERG , VEIT, DR. |
分类号 |
B60L3/00;H02H1/00;H02H3/12;H02H3/20;(IPC1-7):H02H1/00 |
主分类号 |
B60L3/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|