摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide an installation work management system ensuring the consideration of an interference or the like of an installation carry-in route, and allowing dynamic production and a change of an installation process. <P>SOLUTION: This installation work management system has: a material model database 102 for storing a material model formed by 3D-CAD modeling a plurality of materials constituting a plant structure; a structure model database 103 for storing a structure model configured by connecting a plurality of material models; an input means 104 for inputting and setting installation data including a reception day and an installation completion setting day of the material related to the structure model; and an installation work confirmation means 105 for confirming an installation progress situation of the structure model on a designated day input by the input means 104 on the basis of the installation data, and displaying a 3D image of the structure model completed with installation on a display screen 106 on the basis of the confirmed installation progress situation. Because the 3D image of a plant on the input designated day is displayed, an installation planner can easily confirm the installation progress situation. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |