摘要 |
<p><P>PROBLEM TO BE SOLVED: To accurately verify a production plan, and to quickly prepare it without generating any individual difference. <P>SOLUTION: When the order of various types of products is received, necessary manufacturing processes through which the products whose order has been received pass are decided, and a manufacturing lead time, a cycle calendar and an operation cessation schedule are read based on the necessary manufacturing processes (a step S3), and a reference time is set based on the manufacturing lead time (a step S4), and a manufacture marginal day on which a cycle is reflected is decided for each manufacturing order (a step S5), and the manufacturing order is assigned to the cycle based on the manufacture marginal day so that a plan manufacturing day can be decided (a step S6), and difference display data showing a difference between the manufacture marginal day and the plan manufacture day are outputted. The accurate verification of the setting of the cycle is operated from the output result, and production adjustment such as the change of the cycle, the change of the term of delivery and the change of the operation cessation date is executed. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |