摘要 |
FIELD: heat engineering, designed for rational heating of boiler house rooms for heat supply of industrial enterprises and residential districts. ^ SUBSTANCE: the method consists in bleeding of air outside the boiler house room. The boiler room with the id of a partition is divided into two isolated compartments. Mounted in the first compartment is the equipment giving off toxic solid and gaseous substances during operation thus contaminating the atmosphere (for example, boilers with burners), and installed in the second compartment is the equipment liberating heat during operation without liberation of harmful substances (heat exchangers, water heaters, etc.). The equipment of the second compartment liberates heat during operation that is accumulated under the building roof. This warm and clean air with the aid of ventilation plants is supplied through pipe-lines to the lower zone of both compartments located at the zero level. There is no need in use is made of already available resource. ^ EFFECT: reduced consumption of electric power for producing optimum temperature in the boiler house. ^ 1 dwg |