发明名称 WORK EXECUTION METHOD FOR FOUNDATION PILE
摘要 PROBLEM TO BE SOLVED: To work execute a foundation pile having a steel frame reinforced enlarged part larger than a pile diameter at a prescribed position of the pile with excellent workability. SOLUTION: In a work execution method for the foundation pile providing the steel frame reinforced enlarged part larger than the pile diameter at the prescribed position of the pile, a steel frame reinforced body 10 having a structure enlarged by compression force acting in a vertical direction at the prescribed position of an existing pile. The steel frame reinforced body 10 in a prescribed depth is enlarged to widen a pile hole so as to be enlarged, and after enlarging the pile hole, the steel frame reinforced body is a reinforced material of the enlarged part as it is. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005200865(A) 申请公布日期 2005.07.28
申请号 JP20040006188 申请日期 2004.01.14
申请人 GEOTOP CORP 发明人 KOJIMA EIJI
分类号 E02D5/44;E02D5/48;E02D5/54;E02D7/00;(IPC1-7):E02D5/44 主分类号 E02D5/44
代理机构 代理人
主权项
地址