发明名称 METHOD FOR PREPARING SCHEDULE, SCHEDULE PREPARATION SYSTEM AND PROGRAM
摘要 <p><P>PROBLEM TO BE SOLVED: To prepare a schedule suited to a manufacturing site in which a lot integration operation is performed. <P>SOLUTION: In a schedule preparation system 1, an initial schedule preparation part 10 prepares an initial schedule of task unit on the basis of process information 11, order information 12 and a lot integration condition 13, and stores the prepared initial schedule in task information 21 in a schedule information storage part 20. Then, a lot conversion part 30 converts the initial schedule into a schedule of a lot unit, stores the schedule in task information 22 and displays the schedule on a schedule result display part 40. An operator instructs a change of a specific lot in the displayed schedule by using a mouse 52, and a moving information storage part 50 stores the moving information of the lot. In addition, a schedule correction part 60 corrects violation of a schedule restriction condition which may be generated due to the change. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p>
申请公布号 JP2005190241(A) 申请公布日期 2005.07.14
申请号 JP20030431872 申请日期 2003.12.26
申请人 KOBE STEEL LTD 发明人 UMEDA TOYOHIRO
分类号 G05B19/418;G06Q50/00;G06Q50/04;(IPC1-7):G05B19/418;G06F17/60 主分类号 G05B19/418
代理机构 代理人
主权项
地址