摘要 |
PROBLEM TO BE SOLVED: To provide a scheduling method and device for enabling different jobs to be executed efficiently without changing a plurality of operations for the jobs and the sequence of intervals between the operations. SOLUTION: The content stored per unit time in the storage part of a job time storage means that sets the operation of each job and the sequence of the intervals between the operations, that is, the time-series sequence of an operation allocation mark, is fitted into the storage parts per unit time of all time storage means according to a predetermined rule of fitting it into them, so as to set all the operations of all the jobs and the sequence including the intervals between the operations. Thus, a schedule that allows efficiently executing each job can be created without changing the operation of each job and the sequence of the intervals between the operations. A determination as to whether the sequence fits in is made as the time to start fitting, set in all the time storage means, is advanced by unit-time one by one. COPYRIGHT: (C)2005,JPO&NCIPI
|