摘要 |
A method includes identifying a plurality of facilities in a complex. Each facility is associated with a construction project. The method also includes determining a potential revenue (228) associated with at least one of the facilities. The method further includes determining a cost (218) associated with at least one of the facilities. In addition, the method includes generating a schedule of the construction projects (222) using the identified potential revenue and the identified cost. |