摘要 |
Process for supporting retaining walls from behind with earth comprises subsequent attachment of load-distribution bodies. Cavities (4) produced at lateral intervals at the rear side (1) of the wall are filled with the material forming the load-distribution bodies. Each cavity is formed by sinking a shaft (6) into the earth surface (5) directly at the rear side of the wall by removing earth and the material forming the load-distribution bodies is introduced into the shaft. |