发明名称 CONCRETE TOWER
摘要 <P>PROBLEM TO BE SOLVED: To provide a concrete tower which can enhance the working efficiency of the construction of the tower, which enables maintenance inspection of prestressing steel to be surely performed with ease, and which can enhance workability in demolition. <P>SOLUTION: The tower body 14 is constituted by vertically stacking a plurality of tubularly formed precast segments 22, 24 and 26. A plurality of bars 32A, 32B, 32C, 32D and 32E of prestressing steel for introducing prestress among the precast segments are arranged in the internal space of the tower body 14 so as to constitute an outer cable structure. Thus, the arrangement and tension of the PC steel can be performed concurrently with the installation of the next precast segment. Additionally, the prestressing steel is arranged outside the member cross section of the precast segment, so that the maintenance inspection of the PC steel can be easily and surely performed, and so that demolition work can be safely and smoothly performed. <P>COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005180082(A) 申请公布日期 2005.07.07
申请号 JP20030424255 申请日期 2003.12.22
申请人 SUMITOMO MITSUI CONSTRUCTION CO LTD 发明人 KASUGA AKIO;UCHIDA SEIJIRO;TAIRA YOSHIHIKO;YASUAKE JUNJI;KUWANO MASAHARU
分类号 E02D27/32;E02D27/42;E04H12/16;F03D11/04 主分类号 E02D27/32
代理机构 代理人
主权项
地址