摘要 |
<p><P>PROBLEM TO BE SOLVED: To surely prevent short circuit at the fusible part of a bus bar due to fusion slag. <P>SOLUTION: In the electric connection box 1 containing a bus bar 21 having a fusible part 34 for overcurrent in a connection box body 2, a section 35 for receiving fusion slag of the fusible part is provided on the underside of the bus bar 21 below the fusible part 34. The blown-out dregs containing section 35 is constituted by surrounding the receiving surface with a wall part and/or ribs 37 and 38. The bus bar 21 is arranged longitudinally and a cut is formed in the bus bar 21 on the underside of the fusible part 34. An insulating connector block 4 is arranged on the underside of the bus bar 21 and provided with the fusion slag containing section 35. Terminal of other bus bar 22 is contained in the connector block 4 and the insulation wall 50 of other bus bar is arranged contiguously to one fusion slag containing section 35. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |