发明名称 CONSTRUCTION METHOD OF TUNNEL LINING CONCRETE
摘要 PROBLEM TO BE SOLVED: To excellently and surely place concrete without generating a void even in a top end part of secondary lining concrete, particularly, in a construction joint, in a construction method of lining concrete, particularly, the secondary lining concrete in constructing a tunnel. SOLUTION: When placing the secondary lining concrete in an interval while arranging a form at the predetermined interval on the surface near the natural ground or the surface near the primary lining of the tunnel, an de-gass hose is arranged in the vicinity of a tunnel top end part, and the secondary lining concrete is placed in the interval while forcibly sucking air in the interval via the de-gassing hose. For example, when respectively and successively jointing the secondary lining concrete by the predetermined unit length in the tunnel longitudinal direction, the degassing hose is preferably arranged in the tunnel peripheral direction in the vicinity of the tunnel top end part in the vicinity of the construction joint of the secondary lining concrete. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005179891(A) 申请公布日期 2005.07.07
申请号 JP20030417478 申请日期 2003.12.16
申请人 KFC LTD 发明人 SAKURAI HIROSHI;HAYASHI HIDEAKI
分类号 E21D11/10;(IPC1-7):E21D11/10 主分类号 E21D11/10
代理机构 代理人
主权项
地址