发明名称 |
Production plan automatic generation method for a technical product, wherein predefined dependencies between production parameters for same or sequential time intervals are incorporated and an iterative process applied |
摘要 |
<p>Method for automatic generation of a production plan for a technical product in which predefined dependencies between different parameters for the same time interval or sequential time intervals are obtained; the dependencies are automatically summed over several time intervals; the production planning parameters are populated in a test manner with possible parameters; it is checked with the test planning parameters can be combined in an allowable manner with the dependencies and; an iterative process is applied in which different possible parameters are used. The invention also relates to a corresponding computer program product for implementation of the inventive method.</p> |
申请公布号 |
DE10355888(A1) |
申请公布日期 |
2005.07.07 |
申请号 |
DE2003155888 |
申请日期 |
2003.11.29 |
申请人 |
DAIMLERCHRYSLER AG |
发明人 |
APOSPORIDIS, STATHI;BAUMGAERTEL, HARTWIG;GELZHAEUSER, THOMAS;JOHN, ULRICH;KOENIG, FELIX;LASCH, REGINA;SCHROEDER, ROLF;WILKE, JOERG |
分类号 |
G06Q10/00;(IPC1-7):G06F17/60;G06F19/00 |
主分类号 |
G06Q10/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|