发明名称 |
METHOD OF DESIGNING SIDE TUNNEL |
摘要 |
PROBLEM TO BE SOLVED: To provide a side tunnel which has a stable middle part by design of considering load applied to the middle part between tunnels in construction of the side tunnel to be closely arranged. SOLUTION: Earth covering H of the side tunnel to construct is compared with a whole width Da of the side tunnel. When the earth covering H is longer than the whole width Da of the tunnel, analysis through a finite-element method is carried out by modeling of an amount of the whole width Da from a crest of the tunnel without modeling of a shallower natural ground part Y. COPYRIGHT: (C)2005,JPO&NCIPI
|
申请公布号 |
JP2005180097(A) |
申请公布日期 |
2005.07.07 |
申请号 |
JP20030424754 |
申请日期 |
2003.12.22 |
申请人 |
MAEDA CORP |
发明人 |
NASHIMOTO YUTAKA;SAKURAI TAKAOMI;MORITA KOJI;KUROKI SHIGEMORI;MIYANOMAE SHUNICHI |
分类号 |
E21D11/10;(IPC1-7):E21D11/10 |
主分类号 |
E21D11/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|