发明名称 DISPLACEMENT ADJUSTING METHOD IN OVERHANGING INSTALLING CONSTRUCTION METHOD FOR CONCRETE GIRDER
摘要 PROBLEM TO BE SOLVED: To perform construction while accurately holding a horizontal level, when placing concrete in the final stage, in an overhanging installing construction method for performing construction by repeating an overflow by lifting an overhang tip part. SOLUTION: This installing construction method constructs a bridge girder 2 by successively overhanging a column capital 18 as a cantilever part via an existing girder block, by constructing the girder block by alternately placing the concrete on both sides in the bridge axis direction from the column capital part 18 of a pier 6. This displacement adjusting method in the overhanging installing construction method of a concrete girder, is characterized by holding the height of a new girder block constant in a tip part 20 by overhanging by removing a load of a counterweight so as to offset displacement of the tip part 20 by overhanging by a load increase caused by placing the concrete, by arranging the counterweight having weight adjusted to the planned height just after placing the concrete in the overhanging tip part 20, before placing the concrete of the new girder block. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005171638(A) 申请公布日期 2005.06.30
申请号 JP20030413526 申请日期 2003.12.11
申请人 ORIENTAL CONSTRUCTION CO LTD 发明人 SAITO YOSHIO;KAIZU MASAAKI;ABE YUTAKA;SATO HITOSHI
分类号 E01D21/00;E01D2/00;(IPC1-7):E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址