发明名称
摘要 PROBLEM TO BE SOLVED: To build a large sectional main girder in large width by a precast segment by shop fabrication, and to conduct building works by a normal erection girder or the like in the precast segment construction method of a bridge. SOLUTION: A large sectional main girder such as a viaduct is divided into three in the bridge-axis rectangular direction, and composed of a box-shaped sectional precast core segment 1 and a pair of left-right precast overhanging floor slabs 2, 2, and the overhanging floor slabs 2 are supported by struts 3 comprising a precast concrete member, a steel pipe, a concrete-infilled steel pipe, H-steel or the like. The lower ends of the struts 3 are joined with an external side face in the bottom slab section 1b of the core segment 1 by joining sections 4, the upper ends of the struts 3 are joined with undersides at the front end sections of the overhanging floor slabs 2 by joining sections 5, and the base end sections of the overhanging floor slabs 2 are cemented with the external side face of the floor slab section 1a of the core segment 1 by joining sections 6, thus constituting a main girder segment.
申请公布号 JP3666326(B2) 申请公布日期 2005.06.29
申请号 JP19990346202 申请日期 1999.12.06
申请人 发明人
分类号 E01D21/00;E01C1/00;E01D1/00;E01D2/00;E01D2/04;E01D19/12;E01D21/10;E01D101/24;E01D101/26;(IPC1-7):E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址