发明名称 |
FILLING CONCRETE FALL PREVENTION MECHANISM IN CONCRETE BRIDGE |
摘要 |
PROBLEM TO BE SOLVED: To provide a filling concrete fall prevention mechanism in a concrete bridge capable of preventing the fall of collapsed concrete pieces and a steel plate by bearing the steel plate laid between PC girders by uniform force. SOLUTION: The mechanism includes a fall prevention plate 4 mounted between the PC girders 1 so as to cover the bottom of the filling concrete, a string-like supporting material 6 located downward of the fall prevention plate 4 and stretched between horizontal girders 5 constructed for connecting each PC girder 1 and a plurality of vertical supporting materials 9 vertically arranged so that the string-like supporting material 6 can be successively getting longer toward the center of each horizontal girder 5 required to be stretched in an arched shape between the fall prevention plate 4 and the string-like supporting material 6. COPYRIGHT: (C)2005,JPO&NCIPI
|
申请公布号 |
JP2005155167(A) |
申请公布日期 |
2005.06.16 |
申请号 |
JP20030395158 |
申请日期 |
2003.11.26 |
申请人 |
CHIYODA ENGINEERING CONSULTANTS CO LTD |
发明人 |
MURAKAMI TAKESHI;UENO YUJI;KATSUYA YASUYUKI;ANAI SATORU |
分类号 |
E01D21/00;E01D2/00;(IPC1-7):E01D21/00 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|