发明名称 HYBRID PILE AND CONSTRUCTION METHOD FOR HYBRID PILE
摘要 PROBLEM TO BE SOLVED: To provide a hybrid pile having high axial force and yield strength against horizontal force, and capable of coping with a big earthquake, on the basis of rigidly joining a structure and a pile head part; and a construction method of the hybrid pile. SOLUTION: A lower pile part 2 is constructed in a hole by drilling the hole in the ground, and a steel pipe 8 with a rib for constituting an upper pile part 3 is built up so as to be integrated with the lower pile part 2. The upper pile part 3 is constructed by filling a first hardening material 9 in a hollow part of the steel pipe 8 with the rib for constituting the upper pile part 3. When constructing a foundation of the structure 10, a head expanding member 4 is fitted to an outer peripheral surface so as to contain the pile head part of the upper pile part 3 at a point of exposing the vicinity of the pile head part of the upper pile part 3, and a second hardening material 11 is filled so as to embed the pile head part of the upper pile part 3 inside. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005155103(A) 申请公布日期 2005.06.16
申请号 JP20030392938 申请日期 2003.11.21
申请人 SHIMIZU CORP;SUMITOMO METAL IND LTD 发明人 OTSUKI AKIRA;ISODA KAZUHIKO;KOBAYASHI YOICHI;TANAKA HIROMASA
分类号 E02D5/50;E02D5/34;E02D7/00;E02D27/12;(IPC1-7):E02D5/50 主分类号 E02D5/50
代理机构 代理人
主权项
地址