摘要 |
PROBLEM TO BE SOLVED: To provide an elevated structure capable of being executed rapidly in a simple method and a reinforcing method of the elevated structure and the elevated structure capable of being obtained thereby. SOLUTION: After a pile P1 pierces the end of a beam 11 of a bridge pier 10 and the predetermined positions of a main girder 21 from the surface of the floor 22 constituting a road or the like and the pile P1 has vertically placed, the front end of the pile P1 is supported in the ground, thereafter, the upper part of the pile P1 is fixed to the beam of the bridge pier 10 and the main girder 21, thereby, the beam and the main girder 21 of the bridge pier 10 are supported vertically to prevent the vibration. The reinforcing method of the elevated structure and the elevated structure can be obtained by this. COPYRIGHT: (C)2005,JPO&NCIPI |