发明名称 |
DEVELOPMENT WORK PERIOD REDUCTION SUPPORT METHOD |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To solve a problem in that work procedures involving a lot of manual follow-up is evolved depending on good or poor verification accuracy derived from considering no verification phase in deciding management standards for each work item, or the like in conventional development work period reduction support. <P>SOLUTION: A development work period reduction support method implements the following steps by means of an operation means: (1) a step for shifting the existing standardization work item having established standards to the head side of a DSM before starting production preparation in each work item for the generated DSM; (2) a step for rearranging each work item in the phase on a production preparation phase basis in the order of management/measurement items, and the like; (3) a step for copying the work item having short correction time in design/adjustment items to the final phase; (4) a step for receiving the addition of dependence relation additional information to between the design/adjustment items dependent on the same management/measurement items in the design structure matrix; and (5) a step for generating a work flow by arranging the work item having the dependence relation information, or the like to locate at the lower portion of the major diagonal line and the vicinity of the major diagonal of the design structure matrix. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |
申请公布号 |
JP2005135323(A) |
申请公布日期 |
2005.05.26 |
申请号 |
JP20030373139 |
申请日期 |
2003.10.31 |
申请人 |
TOYOTA MOTOR CORP;TOYOTA CENTRAL RES & DEV LAB INC |
发明人 |
SUZUKI TOSHIYUKI;MIYAJIMA NOBUAKI;SATO MORIKAZU;INAMORI YUTAKA |
分类号 |
G05B19/418;G06Q50/00;G06Q50/04;(IPC1-7):G06F17/60 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|