发明名称 Continuous method of realization of works underground, tunnels and excavations in general with works of consolidation, permeabilization and drainage obtained through guided perforations
摘要 Continuous method of realization of underground tunnels, including the steps of making a plurality of guided perforations of small cross-section around a periphery of an underground tunnel to be realized and extending at least a majority of length of the underground tunnel to be realized, by perforation equipment with a movable perforation head, filling each guided perforation through at least one of reinforcements and aggregating materials to consolidate the tunnel with a resistant arrangement according to precise static conditions, and excavating the tunnel within the filled perforations.
申请公布号 US6893188(B2) 申请公布日期 2005.05.17
申请号 US20040754078 申请日期 2004.01.07
申请人 FERRARI DE NOBILI S.R. L. 发明人 FERRARI FRANCO
分类号 E02D3/12;E02D29/05;E21B7/04;E21D9/00;E21D21/00;(IPC1-7):E21D11/00 主分类号 E02D3/12
代理机构 代理人
主权项
地址