发明名称 |
Continuous method of realization of works underground, tunnels and excavations in general with works of consolidation, permeabilization and drainage obtained through guided perforations |
摘要 |
Continuous method of realization of underground tunnels, including the steps of making a plurality of guided perforations of small cross-section around a periphery of an underground tunnel to be realized and extending at least a majority of length of the underground tunnel to be realized, by perforation equipment with a movable perforation head, filling each guided perforation through at least one of reinforcements and aggregating materials to consolidate the tunnel with a resistant arrangement according to precise static conditions, and excavating the tunnel within the filled perforations.
|
申请公布号 |
US6893188(B2) |
申请公布日期 |
2005.05.17 |
申请号 |
US20040754078 |
申请日期 |
2004.01.07 |
申请人 |
FERRARI DE NOBILI S.R. L. |
发明人 |
FERRARI FRANCO |
分类号 |
E02D3/12;E02D29/05;E21B7/04;E21D9/00;E21D21/00;(IPC1-7):E21D11/00 |
主分类号 |
E02D3/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|